Skip to main content

Nepal Earns NPR 3 Billion from Electricity Exports Amid Growing Concerns Over Production and Market Expansion

Pipeline installation work finalized in the 40 MW capacity Rahughat Hydropower Project tunnel under construction in RaghuGanga Rural Municipality, Magdi, by Nepal Electricity Authority's subsidiary, RaghuGanga Hydropower

Photo Credit: RSS

Energy Minister Biraj Bhakta Shrestha announced on Monday during a program organized by the Nepal Electricity Authority (NEA) that Nepal is positioned to export nearly NPR 3 billion worth of electric power.

He interpreted the electric power trade data from last fiscal year in foreign markets as not only an achievement but also as evidence that “Nepal is undergoing transformation.”

However, some energy experts note that despite the positive statistics, full confidence is yet to be established regarding the reliability of foreign markets and the expansion of domestic consumption alongside continuously increasing production. They warn that when production increases without corresponding market and consumption growth, there is a heightened risk of electricity being wasted in a disorganized manner.

Notably, in recent years, the issue of electricity wastage during the monsoon season has become evident.

“Overproduction of one or two hundred megawatts is not necessarily a problem; it can be considered as reserve capacity,” said Mohan Dangi, President of the Independent Power Producers’ Association Nepal (IPPAN). “However, as new production increases, this issue could become a significant problem.”